Soil Testing

What is the time required for soil or plant analysis?

Generally, it takes 3 to 5 working days to complete a soil analysis through the soil testing laboratory. The turn around time is effected by seasonal sampling and instrument failures.

 

Center for Technology Outreach 316 Bost Extension Center Mississippi State MS 39762